Deviation from Drainage Design Criteria – Region Four, updated April 4, 2022
Deviation from Drainage Design Criteria – Region Four, updated April 4, 2022 https://adobesigne.na1.documents.adobe.com/public/esignWidget?wid=CBFCIBAA3AAABLblqZhCfQG8pAsIiMOScdGFYtMsYUDYwSLcntJ0v1hGoXkgIFVypr7HEMxT99JhhNeYC7LE*
Description:
An approved design deviation is required for all deviations from the drainage design criteria and procedures included in the DMOI. Use the region specific forms to request a deviation.
This form is to request a deviation from drainage design criteria for a project in Region Four because the proposed design does not comply with criteria or policies in the Drainage Manual of Instruction.
/business/design/drainage-design-hydraulics/




