Draft DBE Methodology and Goal – Frontrunner Strategic Double Track project
Draft DBE Methodology and Goal – Frontrunner Strategic Double Track project https://drive.google.com/file/d/14G43GFbOrlbKjpyB9B5-8drKdkz4D3MC/view
Description:
Draft DBE Methodology and Goal – Frontrunner Strategic Double Track project
The Utah Department of Transportation (UDOT) has prepared this document to describe the methodology used
to establish its Disadvantaged Business Enterprise (DBE) goal for the Frontrunner Strategic Double Track
project. This goal is for this single project separate from the Utah Transit Authority’s (UTA) program goal. The
DBE goal setting methodology is a requirement set forth in the United States Department of Transportation
(USDOT) DBE regulations. The UDOT followed the regulations and guidance contained in the USDOT DBE
regulations, 49 CFR Part 26.




